Here is every project at both campuses, with what's already on hand and what each one still needs. Find one that fits what you have, then call or text us to claim it.
Unless the Lord builds the house, they labor in vain who build it.
Psalm 127:1
Everything we need right now
15open projects at G&M McIntosh Saltwater Youth Camp, 7th Mile Farm and around the state
Soonest deadlineJanuary 8, 2027, for Biking to the Bluff. 2 projects need to be ready by then.
Every project here stays open. Even when someone has signed up, plans can fall through and timing can slip, so a second offer is never wasted. Whether you have a skill, a trade, an afternoon, materials or money, there is a place for it.
laying it out
Find one that fits you
Where
You can give
Size
15 of 15 projects shown
Small jobs
Quick to finish, a good place to start
3 projects
7th Mile FarmSiteHelp welcome
Small
Cap and seal two light pole bases
Open now
At the lake house, the power entry at the base of two light poles was never enclosed.
Materials
Needed Caps and sealant for two pole bases.
Estimate coming
Labor
Help welcome An electrician to close up the power entry at the base of each pole.
We have a small handy house, about eight by sixteen feet, to turn into an office near the lodge. It gives the ministry a quiet place to keep its work organized.
Materials
Needed Paint and cleaning supplies, plus light pole pieces to hold one side level.
Estimate coming
Labor
Help welcome Hands to paint and clean the building, and someone with an auger to set the poles.
Time estimate coming
2 steps
Paint and clean up the building
Auger holes and set light pole pieces to keep one side elevated and level
All three run, but none runs well. Campers take turns at the wheel with an adult beside them, or ride the pontoon around the pond, during the summer camps.
Materials
Needed Parts for three older two-stroke outboards: a 25 hp Evinrude, a 90 hp Yamaha on the pontoon and a 15 hp Mercury.
Estimate coming
Labor
Help welcome A marine mechanic who knows older two-strokes, plus experienced boaters to supervise during camp.
Time estimate coming
5 steps
Replace the 25 hp throttle cam roller and lower the motor so it stops cavitating
Check the 25 hp gear case seals
Fix the pontoon's cavitation and check the 90 hp Yamaha for corrosion
Tune up the 15 hp Mercury
Water pump, gear oil and basic service on all three
Chris calls it "probably our highest priority boat need at the moment." Campers will arrive at G&M McIntosh Saltwater Youth Camp on it. It sits on a trailer at Belle Bluff Island, set up for two outboards, with a bow thruster for docking.
Materials
Needed Two outboards with enough push for the tides, a windshield pane, a rear window.
Estimate coming
Labor
Help welcome A marine mechanic for motors and wiring; hands to clean the hull.
the grassy bank at the farm's pondthe pond's dock with pontoon boats
1 of 2
7th Mile FarmSiteHelp welcome
Large
Build a boat ramp at the pond
Open now
A ramp into the farm's pond for putting boats in and out, next to the steel cover that needs a new roof. The bank by the dock is grass down to the water.
Materials
Needed Concrete and forms for a ramp about 20 to 30 feet wide. Chris says a couple of scoops of #57 stone and some grade work coming up the hill from the water's edge would likely do.
Estimate coming
Labor
Help welcome A concrete crew, or someone with a tractor to spread the stone and grade the bank. It's a private pond, so no permit is needed.
Finish two cabins, an activity building and the dining hall at G&M McIntosh Saltwater Youth Camp
Open now
Every building is underway and more than halfway done. Finishing them lets us serve more of Georgia's kids in foster care. Biking to the Bluff raises money for this.
Materials
Partly on hand The steel building for the 6,000 sq ft dining hall was donated, and the hall is dried in.
Around $200,000 to finish all four buildings
Labor
Help welcome Trades of every kind. Come tour the buildings anytime.
Our second campus at G&M McIntosh Saltwater Youth Camp is coming soon. It lets us serve more children in foster care. We hope to host our first camp there this summer, and that depends on finishing the dining hall.
Materials
Needed A commercial air conditioner, flooring and drywall, plus the septic system the hall depends on.
Estimate coming
Labor
Help welcome An HVAC contractor, a septic contractor, drywall hangers and finishers, and a flooring crew.